午夜精品一区二区三区在线视,97无码免费人妻超级碰碰踫,中文字制服丝袜在线播放,91九色精品国产

Pressure test reservation

新聞資訊

新聞資訊

Tonzo ppr quickly install the elevator base is listed in March

2017-03-30
Product pictures
 

At the time of installation, a elevator base is installed at 1 m per interval.

As shown in the figure below:

Each hanger can be up to 600N.

It's about 4.8 N per meter in full water,

600N>>>>>>4.8N。



Ensure the quality of the products is stable while ensuring the speed of installation.